Drilling with Anticipation

Alas! We have arrived the first site and the drilling crew have started the assembly of drill pipes and core barrels! They have to attach over 500m worth of initial piping for the 520m water depth that we have at the site. While the JR is on Dynamic Positioning (DP) mode, the Captain can now rest his feet and let the ship maintain location using inbuilt thrusters.

Like everyone else, the drilling crew started drilling almost halfway through my night shift and they continued until the sun rose, and still the 500m worth of pipes were only completed by time my shift was over at midday.

Working from Dusk to Dawn

Working from Dusk to Dawn

Sometimes, they have to swing about to get all the parts attached.

Drillers on swings

Drillers on swings

Other times, they get to use fancy machinery to attach pipes together.

Attaching the pipes

Attaching the pipes

The derrick is so high so that attaching pipes in between would be possible.

The pipes are 10m long

The pipes are 10m long

I do not know much about the drill floor. All I can say is that it looks pretty cool and I am very impressed with the crew working outdoors, rain or shine with all these heavy machinery and noise around them; not to mention the humidity and the heat too!

Very soon there will be the first core on deck – and I absolutely look forward to it!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s